DAIMLER Proving Ground, Northern Cape, South Africa
DAIMLER Proving Ground for arid hot climate testing Upington, Northern Cape, South Africa. Engineering and realization of a full scale proving ground.
Services:
- site evaluation and due diligence
- value engineering and estimates
- concept design, detailed design, working and construction drawings of all civil constructions (roads, bridges, earthworks, drainage), buildings, MEP services and infrastructure works
- specialist studies, EIA environmental impact study and assessment, noise and air pollution studies, etc.
- approved applications for all required permits
- tendering and procurement of general contractor´s services
Key Facts:
- property size appr. 3.600ha
- superelevated high speed oval length approx. 17.4km
- handling track appr. 5,500m
- VDA dynamic area appr. 70. 000m²
- various slope hill/grades
- building area incl. MEP services
- access roads approx. 5.000km
Goal:
- arid-hot-huge-remote-sandy-fast
Client:
- Mercedes Benz South Africa Ltd., Südafrika